Pelham Manor Using Every Available Method for Snow Removal

Written By: Robert Cox

PELHAM MANOR, NY (January 28, 2026) — Pelham Manor officials announced that snow management operations are ongoing after a storm delivered more than a foot of snow, requiring multiple days and rounds of clearing to reach ideal conditions.

The village is using every available method for snow removal, with the Department of Public Works focusing on sidewalks, curb cuts, public transportation facilities and intersections. Officials noted that the situation changes daily as public and private clearing efforts occur simultaneously.

In a related update, the parking lot at Village Hall must be plowed, requiring all vehicles to be removed by 12:00 p.m. on Wednesday, January 28, 2026. Any vehicle remaining in the lot after that time will be towed pursuant to Pelham Manor Code Chapter 202-20.

The village continues to deploy its sidewalk plowing machine despite challenges from the high volume of snow accumulation and a layer of sleet that iced over on top. Officials described sidewalk clearing as a joint effort with residents and said plows are circling back to ensure curb cuts are clear and to refine efforts after residents have cleared their properties.

This article was drafted with the aid of Grok, an AI tool by xAI, under the direction and editing of Robert Cox to ensure accuracy and adherence to journalistic standards.